Installation of "Wave" by Peter Flanary • June, 2005 • page 2 of 5

10_3286.jpg
Peter intends "Wave" to be touched.
11_3319.jpg
Sample river rocks to be installed in "Wave's" hollow interior.
12_3288.jpg
Peter showing how the rocks will be placed.
14_3321.jpg
Several rocks installed
15_3342.jpg
Peter drilling mounting holes
16_3374.jpg
Removing cardboard molds from concrete mounting pads.
17_3355.jpg
Assistants working from both sides
18_3392.jpg
Rock installation is a team effort.
19_3398.jpg
Peter washing rocks to check true colors

[Return to Wave Home] [First Page | Next Page | Last Page]